Skip to content

T-30 Days (May 20) — Foundation Lock

Calendar: 2026-05-20 (for 2026-06-19 race start). T-30 has passed. This doc now serves as a retro-checkpoint and template for future Newport-Bermuda campaigns on Lupo Di Mare.


TL;DR

  • Foundation lock by T-30: crew, boat, registration, polar, and base routing analysis in place.
  • Race-week practice schedule locked — the drill cards in drills/ reference this calendar.
  • ORR / SDL cert status documented(historical: VPP polar was PENDING ORR as of 2026-05-16; the cert is now FINAL #US43225 and loaded.)
  • Major race-week deliverables scheduled — every TBD in the role playbooks has a target date.
  • Weather analog framework read once; classification begins at T-10.

Status check (retro for 2026)

Items that should be locked by T-30

Crew & roles:

  • [ ] Skipper confirmed
  • [ ] Navigator confirmed
  • [x] Two Watch Captains assigned — Watch 1 = Joel, Watch 2 = Ryan (navigator-anchors; see Watch Roster)
  • [ ] Bow / Pit / Trim / Driver roster locked across both watches
  • [ ] At least one driver per watch with chop / heavy-air experience
  • [ ] Anti-nausea medication availability confirmed for every crew member

Boat:

  • [ ] Lupo Di Mare registered for 2026 Newport Bermuda Race
  • [x] ORR or SDL cert filed (now FINAL #US43225; was PENDING ORR at 2026-05-16)
  • [ ] Pre-race inspection scheduled
  • [ ] Required-equipment list audited against current SI / NOR
  • [ ] EPIRB / liferaft / MOB gear inspection scheduled
  • [ ] Sail inventory verified against 01_boat_data/sail_inventory.md

Routing tooling:

  • [ ] Expedition installed; license active
  • [ ] North Sails polar loaded as interim (per navigator playbook — Routing tool touchpoints)
  • [ ] GFS / ECMWF / RTOFS / HYCOM access confirmed
  • [ ] SST imagery + altimetry feeds identified
  • [ ] Satellite-comms plan drafted (GRIB download path offshore — race-week deliverable)

Race-week practice:

  • [ ] Race-week schedule confirmed in writing
  • [ ] At least 3 days on the boat between T-7 and T-1
  • [ ] Drill calendar drafted (peel × 3, squall × 1, helm transition × multiple, kite douse × 3)

Foundation reading:

  • [ ] Every crew member has been told: read crew_orientation.md + your role playbook before arriving

Cross-references